FAQ
News
Contact Us
Press
Investors

GREEN3      CONVERSION®

News Update: December 23, 2019

G3C Technologies (G3CT - Basking Ridge, New Jersey, USA) and Green Peaks Group (GPG - Warsaw, Poland) have registered an engineering joint venture G3C Engineering Sp. z.o.o. in Poland on December 20th, 2019.

G3C Engineering will design, manufacture and commission commercial G3C Systems worldwide.

G3CT will transfer to G3C Engineering non-exclusive rights to design, manufacture and commission G3C Systems globally for a period of 20 years. GPG will contribute its competencies in building commercial systems. GPG will secure funding (in cooperation with The National Centre for Research and Development fund, Poland) required to design a commercial G3C System. Green Peaks Energy (GPE), Poland, a subsidiary of GPG, will use G3C Systems built by G3C Engineering for its new plant in Poland.

 

These full commercial size G3C Systems located in Poland will serve as a G3C technology demo for our customers worldwide. 

 

G3C Systems of a total capacity of 30 tpd will be installed on GPE’s Tire Conversion Plant near Gdansk, Poland in 2021.